ManufacturingModule 084 apps
Know what a unit really costs to make Coming by Holi
From material in the door to the finished unit — including what every worker earned and what each product actually cost. You define the stages, the rates and the rules; nothing here is fixed to one trade. Design and sample sign-off happen upstream now, and quality inspection and the compliance record live in their own module downstream — this module is purely the making.
Reads fromPurchasePlanning & Requirements (MRP)Design & Sampling
Writes toInventory & CatalogHR & PayrollAccounting & GSTQuality & Compliance
Part of Operations & Supply
| Stage | Units in | Units out | Rejected | Ageing |
|---|---|---|---|---|
| Machining | 420 | 406 | 14 | 1.2 d |
| Sub-assembly | 406 | 388 | 18 | 2.0 d |
| Wiring & calibration | 388 | 380 | 8 | 1.4 d |
| Final test & pack | 380 | 372 | 8 | 0.8 d |
4 apps in Manufacturing
Production Orders
Your own stages from first operation to finished goods, with work-in-progress visible at each one.
Piece-rate & Contractors
Output-based pay for anyone paid by the piece rather than the hour — pooled completion, per-unit rates, rework and advances resolved into a single payout.
BOM & Consumption
What each product consumes, costed at today’s material rates.
Maintenance
Machines, tools and assets: what is due for service, when it was last done, what it cost, and what stopped while it was down. Planned and breakdown work against the same asset record.